Engineering Specification


(______)* Piping Specification

* insert company of choice!

  1. All pipe is to be made of a long hole, surrounded by metal, preferably centered around the hole.
  2. All pipe is to be hollow throughout the entire length.
  3. All pipe is to be the very best quality, preferably tubular or pipular.
  4. All acid-proof pipe is to be made of acid-proof metal.
  5. O.D. of all pipe must exceed the I.D., otherwise the hole will be on the outside of the pipe.
  6. All pipe is to be supplied with nothing in the hole so that water, steam or other stuff can be put inside at a later date.
  7. All pipe is to be supplied without rust, as this can be more readily put on at the jobsite.
  8. All pipe is to be cleaned free of covering such as mud, tar, barnacles or any form of manure before putting up, otherwise it will make lumps under the paint.
  9. All pipe over 500 feet in length must have the words "Long Pipe" clearly painted on each end so the fitter will know it is a long pipe. Pipe over 2 miles in length must also have these words painted in the middle so the fitter will not have to walk the full length of the pipe to determine if it is a long pipe or not.
  10. All pipe over 6 inches in diameter is to have the words "Large Pipe" painted on it, so the fitter will not use it for small pipe.
  11. All pipe fittings are to be made from the same stuff as the pipe.
  12. All pipe closers are to be open at one end.
  13. No fittings are to be put on pipe unless specified. If you do, Straight pipe becomes crooked pipe.

Source: Anonymous